7/13/2023 0 Comments Primavera p6 resource loadingNote that Baseline options are not available in the Resource Usage Profile, only budgetedvalues. This ability is available in P6 using the ActivityUsage Profile or the Tracking feature. In depthcoverage of each feature described here-in is beyond the scope of this document.ĭisplaying a contiguous resource curve linking the actual curve with the remaining curve hasoften seemed not possible in P6, due to most P6 teaching occurring only on the ResourceUsage Profile (where this is not possible). This document discusses the features of P6 that currently link the actual and forecast resourcecurve, while touching on some of the current shortfalls in managing resources in P6.